Pre-pour, post-pour, code violation and fire letters.

Signed and sealed engineering letters for inspectors, lenders, code enforcement and insurers, so the pour and the job stay on schedule.

Concrete waits for nobody. The forms are set, the rebar is tied, the pump truck is booked, and the inspector says they need an engineer's letter before anyone pours. A1 writes the letters builders need around a pour and after it, plus code violation and fire letters, signed and sealed by a licensed PE.

The letters we write

LetterWhen you need itWhat it says
Pre-pour letterBefore the slab or footings are pouredThe forms, steel and embeds were checked against the foundation plan and are ready to pour
Post-pour letterAfter the pour, often for the next inspection or the lenderThe foundation was built as designed, or what was found and how it was resolved
Code violation letterWhen the city has cited a condition on a propertyThe engineer's evaluation of the cited item and the repair needed to close it out
Fire letterWhen the city, an insurer or an owner needs an engineer's word after a fireThe engineer's findings on the building and what has to happen before it's used or rebuilt

Every letter is signed and sealed by a PE licensed in your project's state.

Pre-pour: call before the pour date

The most common mistake is calling the day of the pour. Call when the forms go up. That gives time to look at the steel and the plan, flag anything that needs to change, and get the letter out while the pour is still on schedule.

What helps us move fast:

  • The foundation plan the slab is being built to
  • The pour date and who the inspector is
  • Photos of the forms, steel, chairs and any embeds, or a time we can see it
  • For post-tensioned slabs, the tendon layout and the stressing records when they're ready

Code violation and fire letters

These start with what the city or insurer actually asked for. Send the notice, the citation or the adjuster's request, along with photos and the address. We'll tell you what the letter needs to cover, whether a site visit is needed, and what it costs before we start.

Who asks for these letters

  • Building inspectors before signing off on a foundation inspection
  • Lenders releasing a construction draw
  • Code enforcement closing out a violation
  • Insurers and adjusters after a fire or other loss
  • Buyers and owners who want the foundation documented

For inspection letters on electrical work, see PE electrical. For other engineering letters, see pre-inspection letters.

Questions

Does someone need to come out before the pour?

Usually, yes. A pre-pour letter says the steel and forms match the plan, so someone has to look at them. Photos can cover some items; we'll tell you which up front.

Can you write a letter for a slab that's already poured?

Yes, that's a post-pour letter. It's easier when there are photos of the steel before the pour, so take them even if nobody asked.

Do you write letters for post-tensioned slabs?

Yes. Send the tendon layout and, after stressing, the stressing records along with the foundation plan.

What areas do you cover?

Dallas-Fort Worth from our office in North Dallas, and Florida. Tell us the address and the pour date and we'll confirm.

How much is a letter?

It depends on the letter and whether it needs a site visit. You get a flat quote before any work starts.

Pour coming up? Send the foundation plan and the pour date or call (214) 382-9584 and talk to the engineer.

Have a set that needs an engineer?

Send the plans and what the city asked for. You'll hear back from the PE who reviews them.

Call Send plans